PRELIMINARY 5 18 2020
The preliminary version of the participation section tables to Volume II are now included. Expect the complete PY 2018 Minority Report, both Volumes I and II, to be released next month. No changes in the preliminary Volume II are anticipated.

Completion of the Minority Report narrative will be required with the PY 2020 grant application. The TEGL for the PY 2020 grants will be released shortly, and no changes are expected in the instructions for the Minority Report narrative.